Shrink tubing green for front wheel lock lever Haflinger
Details
Tags
Description | Assembly Instructions: 1. Slightly preheat the Hebe 2. Pull open the shrink tubing. 3. Start with the hot air gun on the lower part and shrink on. 4. Heat the curve of the lever evenly all around while pulling and thus shrink it on without any creases. 5. Finish shrinking the end piece. 6. Allow to cool and cut off the end with a sharp cutter |
---|---|
additional Infomration | Sperrhebel / Sperre |
Product Tags
Use spaces to separate tags. Use single quotes (') for phrases.
Related Products
-
Excl. Tax: €2.50 €3.00 Incl. Tax
Shrink tube yellow for differential lock lever Haflinger
Excl. Tax: €2.50 €3.00 Incl. Tax -
Excl. Tax: €4.00 €4.80 Incl. Tax
-
Excl. Tax: €4.00 €4.80 Incl. Tax
-
Excl. Tax: €5.75 €6.90 Incl. Tax
Ball socket shift linkage diff.lock reverse Haflinger
Excl. Tax: €5.75 €6.90 Incl. Tax